During the night of 20th-21st February we will be performing maintenance to bring the new 10Gbit/sec switches into service in Geneva.
This will cause a brief disturbance of connectivity to virtual machines as we physically move connections over.
During the night of 20th-21st February we will be performing maintenance to bring the new 10Gbit/sec switches into service in Geneva.
This will cause a brief disturbance of connectivity to virtual machines as we physically move connections over.
Other members of the x9.faelix.net
cluster to follow as we power-cycle them during fan replacements.
We've moved bunny.g.faelix.net
over to production on the new 10G switches.
Core links have been switched over to the 10G uplinks.