During the night of 20th-21st February we will be performing maintenance to bring the new 10Gbit/sec switches into service in Geneva.
This will cause a brief disturbance of connectivity to virtual machines as we physically move connections over.
During the night of 20th-21st February we will be performing maintenance to bring the new 10Gbit/sec switches into service in Geneva.
This will cause a brief disturbance of connectivity to virtual machines as we physically move connections over.
All the VPS hosts are now moved onto the 10G network.
The fans have finally arrived. We're aiming to install them on Friday or Saturday.
Other members of the x1.faelix.net
cluster to follow as we power-cycle them during fan replacements.
We've moved bunny.g.faelix.net
over to production on the new 10G switches.
Core links have been switched over to the 10G uplinks.